Search

close Close close
Prism

Article

Insights and analysis on key topics

Value of Lost Load (VoLL) Study Workshop

Single Buyer advanced the Value of Lost Load (VoLL) study to strengthen the economic foundations underpinning reliability planning within Malaysia’s electricity market. The study commenced in June 2020, with the first stakeholder workshop held in August 2020 and the final workshop completed in March 2021.

The workshop series, organised by Single Buyer together with TNB Labs Sdn. Bhd., brought together representatives from the Ministry of Energy and Natural Resources (KeTSA), Suruhanjaya Tenaga (ST), the Grid System Operator (GSO), TNB Grid, TNB Regulatory and Stakeholder Management, and TNB Retail.

The study examined methodologies to quantify the economic value of electricity supply reliability and the cost implications of service interruptions across different consumer segments. Establishing a robust VoLL benchmark provides an important reference for system adequacy assessments, market mechanisms and planning decisions.

By embedding economic valuation into reliability planning, Single Buyer strengthens transparency in market parameters and enhances the analytical framework that guides generation adequacy and investment signals within Malaysia’s evolving electricity market.